Mold processing production steps

Specialty
No matter what the matter before the need to do a good job planning, mold processing is also true, after receiving a mold processing work, the need to develop a mold processing shop management and production planning, and information content summarized into a table to guide after Of the processing work.

What does the mold processing schedule include?

1, material

Material is the basis of mold processing, raw materials in the workshop under the plan, raw materials should be in place, to ensure quality and order size. In the cutting, the need to pinch the size, to minimize or avoid unnecessary waste. For auxiliary materials, in order to be able to save costs, to avoid waste, auxiliary materials need to ensure the quality of the premise of the purchase, the staff in the use of trade-in policy, reduce costs.

2, quality

In the process of processing in strict accordance with the processing of the drawings, if you encounter problems, need to discuss clearly in the production, to avoid the quality of the problem caused by time, the cost of waste. At the same time in the process of processing, but also need to minimize the process will appear in the error. And the operator will need to check whether there is a problem in the process, see the problem need to be modified in a timely manner. Such as the deviation of the line, the milling die shunt hole, the welding chamber processing is in place, the drilling hole when the screw hole is too large and so on.

At the same time, after receiving the drawings, the need for analysis of the drawings, and reasonable arrangements for the time to ensure delivery within the specified time on time. If the quality of the accident in the process of processing, according to the severity of the problem given punishment.

Mold processing production planning steps

3, equipment

Equipment is essential for processing, in the process of processing to always keep the equipment clean. If the equipment has a problem, the need for timely response to the higher authorities, timely maintenance, to ensure that the equipment is running, to avoid delays in the production of the situation.

4, staffing

Mold shop planners, for the sawing machine, lathe, scribing, drilling, grinding machines, milling machines, grinding, polishing, mold, line cutting, EDM and other processing need to be equipped with the appropriate staff.

5, staff treatment

In order to improve the enthusiasm of the staff, the need to improve the corresponding staff treatment, rewards and punishments should be clearly defined in the schedule, so that employees understand.

6, workshop management

Workshop management is divided into a lot of content, first from the management staff to start to play a role in order to play an exemplary role. Second, the requirements of employees in strict accordance with the provisions of the company to operate. Finally, the strength of the team is very strong, so managers and operators do the essential work, but also need to strengthen the team management.

7, safe production

In the mold processing industry, safety is in the first place. Different processing requirements for the staff is different, so in the development of mold processing schedule, the safety code is one of the indispensable content, designed to regulate the operator in the processing of the behavior to ensure the safety of the operator and Product of high quality requirements.
This article is divided 1 Page
 FriendLink:DECO disk Spain kendu ghost Germany FAHRION Farian Spanish LAIP handle DECO high electronic control permanent magnet sucker YONNEX tool Italy NUOVA high quality tool Hua Wei 
About Us Products News Factory Tour Contact Us
Copyright:DECO HARDWARE COMPANY LIMITED WEB:Huawei  TEL:0755-27385936 FAX:0755-33865753 E-mail:deco@deco-tool.com